Commercial office rooftop solar array at sunset overlooking the city
Commercial project · Central Business District, Abuja

Abuja office building

A rooftop hybrid system supporting offices, networking and air conditioning for a corporate tenant.

Demonstration project. Configuration is representative of MBB Energy systems; results shown are design estimates until measured data is published.

Location
Central Business District, Abuja
Customer type
Corporate office
Category
Commercial
Project capacity
15 kVA · 15 kWp · 30 kWh
01 · Initial challenge

The situation before installation.

The building’s diesel generator carried most daytime load. Management wanted lower operating costs, cleaner power for IT systems and a quieter working environment.

02 · Energy requirements
  • ≈ 55 kWh daily consumption across offices, servers and AC
  • ≈ 10 kW peak load
  • Critical-load backup for server room and security
03 · System configuration
  • Inverter15 kVA three-phase hybrid inverter
  • Solar array15 kWp — 28 × 550 Wp modules on flat roof
  • Battery storage30 kWh LiFePO₄ rack storage
  • IntegrationThree-phase grid and diesel changeover
  • MonitoringRemote performance monitoring and reporting
04 · Installation images
05 · Results

Design outcomes.

  • Design yield ≈ 18,478 kWh of solar energy per year (4.5 peak sun hours, 75% system efficiency)
  • Battery reserve ≈ 8.1 hours at a 3,000 W average load
  • Measured generator-runtime and fuel savings will be published after 12 months of monitoring data
06 · Customer feedback
Customer feedback will be published here with the client’s written permission.
Awaiting verified feedback
Next step

Discuss a similar project.

Share your property type and current energy costs; we will recommend a configuration and arrange a site assessment.

WhatsApp