Wide aerial view of a large commercial rooftop solar installation
Commercial solar

Energy infrastructure for buildings that cannot stop.

Three-phase hybrid solar, battery storage and generator integration for offices, hotels, hospitals, schools and campuses — engineered from measured load data and modelled for financial return.

MBB Commercial
₦24.15m
Delivery
Design · Build · O&M
Commercial electricity challenges

Energy is now a strategic operating risk.

For commercial operators, power affects operating cost, uptime, tenant and guest experience, and reporting obligations.

01

Diesel dependency

Standby generators carrying daytime office, hotel or hospital load for hours, with volatile fuel prices and supply logistics.

02

Tariff exposure

Band A and maximum-demand tariffs combined with unpredictable feeder availability.

03

Critical-service continuity

Changeover gaps disrupt servers, medical equipment, lifts and guest services.

04

Power quality

Voltage dips and imbalance affect HVAC compressors, IT equipment and sensitive devices.

05

ESG reporting

Tenants, investors and group headquarters increasingly require measurable emissions reduction.

06

Asset reliability

Ageing generators with rising maintenance cost and failure risk.

Commercial office rooftop solar array at sunset overlooking the city
Rooftop solar array on a modern office building
Rooftop solar on a commercial building surrounded by palm trees
Load profiling

We measure before we design.

Commercial systems are sized from interval data, not estimates. We log your building’s consumption to understand base load, peaks, occupancy patterns and generator behaviour.

  • Power-quality and load logging on main incomers (typically 7–14 days)
  • Review of utility bills, diesel purchase records and generator hour meters
  • Identification of critical, deferrable and shiftable loads
  • Base-load, peak-demand and night-time energy analysis
Illustrative 24-hour load profile 00:0012:0024:00
Building loadSolar generation

Illustration only — not measured data.

Commercial solar solutions

An integrated energy system.

Each component is specified to work with the others — and with your existing grid supply and generators.

Rooftop PV arrays

Flat-roof and metal-roof arrays engineered for structural capacity, wind loading and coastal conditions.

Three-phase hybrid systems

Solar, battery, grid and generator integration with automatic dispatch and fuel-saver control.

Battery energy storage

Rack or cabinet LiFePO₄ storage for critical loads, peak shaving and generator runtime reduction.

Monitoring & reporting

Performance dashboards, energy yield and fuel-displacement reporting for management and ESG.

Two hybrid inverters with a lithium battery bank in a dedicated power room
CommercialThree phase

MBB Commercial

Three-phase hybrid system for offices, schools, hotels and healthcare facilities with critical loads.

Inverter20 kVA
Solar22 kWp
Storage20 kWh

≈ 5.4 hours estimated battery backup at a 3,000 W average load (90% usable capacity, 90% efficiency, no solar input; heavier loads reduce backup time).

Supports, for example

  • Multi-room air conditioning
  • Server room and networking
  • Kitchen and cold storage
  • Lifts, pumps and security
  • Medical and laboratory equipment
Commercial plant room with hybrid inverters, battery racks and distribution boards
Two hybrid inverters with a lithium battery bank in a dedicated power room
Engineers reviewing system performance data on a tablet at a solar array
Hybrid, off-grid and storage

Choosing the right architecture.

Hybrid (grid + generator + solar + storage)

The most common commercial configuration. Solar serves daytime load, storage covers outages and evening peaks, and generators run only when required — at their most efficient loading.

Off-grid / captive power

For sites without reliable grid supply. Solar and storage form the primary source with generators as firm backup, designed around autonomy and reserve margins.

Battery energy storage

Storage provides seamless backup for servers and medical equipment, reduces generator start-ups and absorbs surplus solar. Chemistry, C-rate and cycle life are chosen against your duty cycle.

Factories and plants: see industrial solar
Methodology

Engineering methodology for commercial projects

Commercial projects follow a gated delivery process with documented design reviews, method statements and commissioning records.

MBB Energy engineers commissioning a rooftop solar system at dusk
Engineers reviewing system performance data on a tablet at a solar array
  1. 01

    Energy audit & load profiling

    Measured load data, bill and diesel analysis, and site constraints.

    Output: Load study
  2. 02

    Feasibility & financial model

    Options analysis with capex, savings, payback and sensitivity.

    Output: Feasibility report
  3. 03

    Detailed engineering

    Electrical, structural and protection design, SLDs and equipment schedules.

    Output: IFC drawings
  4. 04

    Procurement & installation

    Approved equipment, HSE plan, method statements and supervised installation.

    Output: Installed system
  5. 05

    Testing & commissioning

    Insulation, protection, functional and integration testing with your team.

    Output: Commissioning report
  6. 06

    Operations & maintenance

    Monitoring, preventive maintenance and performance reporting.

    Output: O&M reports
Financial modelling

Investment decisions backed by numbers.

Our feasibility models capture every cost and saving over the project life. Use the calculator for a first view of diesel displacement.

Model componentWhat it covers
Capital expenditureEquipment, engineering, installation and commissioning
Displaced dieselLitres avoided × fuel price, escalated annually
Grid savingskWh avoided × applicable tariff
Operating costsCommercial Care O&M (from ₦350,000/year), inspections, cleaning, monitoring
Replacement reserveBattery and inverter replacement over the project life
OutputsSimple payback, cumulative cash flow, levelised cost of energy (LCOE), CO₂ avoided
Calculator · Generator vs solar

Compare what you spend now with a solar system

Typical at average load; check your own usage.
Example value — update to today’s pump price.
Servicing, oil, filters and repairs, spread per hour run.
Share of today’s generator and grid spend the solar system is expected to replace.
Use the sizing calculator or a quotation; the default is an example only.
Adjust advanced assumptions
Preliminary comparison

Indicative — based entirely on the values you enter.

Annual generator cost—
Annual grid cost—
Annual potential savings—
Detailed results

Unlock your full breakdown and PDF assessment

Receive the detailed figures, a downloadable indicative assessment and a WhatsApp summary. An engineer can then review your inputs.

Assumptions and method
  • Annual generator cost = (litres/hour × fuel price + maintenance/hour) × hours/day × days/month × 12.
  • Solar operating cost = remaining generator & grid spend × (1 − solar contribution) + O&M.
  • Annual savings = current annual spend − solar operating cost. Payback = system cost ÷ annual savings.
  • Five-year view applies the annual cost increase to fuel and grid spend, includes the system cost upfront, and includes battery replacement only if it falls within five years.
  • Excludes financing costs, generator resale value and changes in your usage.
Operations & maintenance

Performance, protected over the system life.

MBB Commercial Care keeps yield, availability and warranties intact — from ₦350,000 per year.

Maintenance engineers at a battery energy storage installation
  • Remote monitoringContinuous, with fault alerts
  • Preventive maintenanceQuarterly site visits
  • Module cleaningQuarterly (monthly in Harmattan on request)
  • Thermal & protection checksEvery visit
  • Performance reportingQuarterly report
  • Warranty administrationHandled by MBB Energy
See all maintenance plans
FAQs

Commercial questions.

Do I need a three-phase system?

Three-phase systems are typically required where the building has a three-phase supply and significant three-phase loads such as large motors, lifts or industrial equipment. Many homes and small businesses operate on single phase. An engineer confirms this during the site assessment.

Do you offer maintenance contracts?

Yes. Essential Care (₦75,000 per year) covers an annual inspection and cleaning; Premium Care (₦150,000 per year) adds a second visit, proactive monitoring and priority response; Commercial Care (from ₦350,000 per year) provides quarterly maintenance and performance reporting for commercial and industrial systems.

Commercial consultation

Request a commercial consultation.

Share your facility type, consumption and diesel use. A senior engineer will review and propose next steps — typically a load study and feasibility assessment.

  • Discovery call with an engineer
  • Data request: bills, diesel records, single-line diagram
  • Site visit and load logging
  • Feasibility report and proposal

Your commercial adviser: Ibrahim Bello

WhatsApp